1 00:00:00,000 --> 00:00:02,352 I'm Chad Bryant and I'm the Manufacturing Lead 2 00:00:02,352 --> 00:00:04,588 for NASA's Space Launch System core stage. 3 00:00:04,588 --> 00:00:06,523 This is Rocket Science in Sixty Seconds. 4 00:00:06,523 --> 00:00:10,327 ♪♪♪♪ 5 00:00:10,327 --> 00:00:12,996 The core stage is the first stage of the 6 00:00:12,996 --> 00:00:16,633 SLS rocket and actually the largest piece of the SLS 7 00:00:16,633 --> 00:00:19,936 rocket. It's over two hundred twelve feet in length 8 00:00:19,936 --> 00:00:22,906 contains two propellant tanks that house over 9 00:00:22,906 --> 00:00:25,108 seven hundred thousand gallons of propellant that 10 00:00:25,108 --> 00:00:29,980 feed four RS-25 engines that produce over two million 11 00:00:29,980 --> 00:00:30,947 pounds of thrust. 12 00:00:30,947 --> 00:00:33,717 ♪♪♪♪ 13 00:00:33,717 --> 00:00:36,586 The core stage consists of five main structures that 14 00:00:36,586 --> 00:00:39,256 have been built, outfitted and are ready to be 15 00:00:39,256 --> 00:00:41,158 stacked and joined together. 16 00:00:41,158 --> 00:00:44,294 ♪♪♪♪ 17 00:00:44,294 --> 00:00:46,430 Next the stage will be loaded onto the Pegasus 18 00:00:46,430 --> 00:00:48,999 barge and transported to Stennis Space Center 19 00:00:48,999 --> 00:00:51,802 Bay Saint Louis Mississippi. There we will perform 20 00:00:51,802 --> 00:00:55,405 wet dress rehearsal and hot fire the four RS-25 21 00:00:55,405 --> 00:00:57,808 engines and do a complete end to end functional